Regenerative Thermal Oxidizer (RTO)

APPLICATION: Methanol washing CO2 waste gas + waste gas

HIGHLIGHT: The size of the RTO is the largest designed by Tecam. It is the project with the highest flow carried out by Tecam (720,000 Nm3 / h) after dilution.

POLLUTANTS AND EMISSIONS LIMIT

NMTHC ≤ 120mg / m3, NOx ≤ 30mg / m3, CH3OH ≤ 50mg / m3, HCN ≤ 1.9mg / m3, SO2 ≤ 50mg / m3.

Sector:

Carbon products.

Client:

Zheijiang Tiandi.

Location:

Yining, China.

Installation year:

2018.

Project size :

6 units of RTO 120,000 Nm3/h (each).